|
|
Ludwig-Boelkow-Systemtechnik
GmbH
Booth No: G68/4
Tuesday, April 16
10:00 am
Speaker: Reinhold Wurster
Roadmap to Hydrogen Refueling
Infrastructure
Reinhold Wurster
Project Manager
H2 and Fuel Cell vehicles
will come to the mass market from 2008 on,
with at least 50.000 units per year. These
figures cannot be reached with fleet vehicles
only. Refuelling infrastructure, statistically
covering 15% of all existing refuelling
stations has to be put in place by then
in a period of not more than 3 years.
|
|
Contact:
Ludwig-Boelkow-Systemtechnik GmbH
Daimlerstraße 15
D-85521 Ottobrunn
Germany
http://www.lbst.de
http://www.HyWeb.de
Visit
the booth of Ludwig-Boelkow-Systemtechnik GmbH
|
|
|
|
|